Planning a training room: checklist for AV technology and tendering

Plan the AV technology around the teaching: first seat count, sources and operation, then projection, displays and cable routes. This guide covers the order of steps, the client's preparatory work and the route to a functional tender.

Short answerInvolve manufacturers or specialist planners early, describe functions rather than products in the tender, and schedule installation outside teaching time.

In what order should the AV technology be planned?

The most common cause of expensive variations is planning that starts with the equipment rather than the teaching. The following order has proven itself.

  1. Fix the seat count and layoutHow many trainee seats, where does the instructor sit, are there group tables? A floor plan with furniture is the single most important document for everything that follows.
  2. List the sourcesWhich pictures need distributing: PCs, laptops, document camera, microscopes, simulators? For each source, what matters is its video output.
  3. Decide on operationWho operates the room, and how often do instructors change? A touchscreen laid out as the seating plan needs no training; connecting to an existing media control keeps operation consistent across the site.
  4. Plan projection and displaysProjector, large display or both? Who sees the projection from which seat? The more trainees see the picture on their own monitor, the smaller the projection can be.
  5. Define cable routesWhere do cables run from the instructor's desk to the trainee seats: floor trunking, dado trunking, raised floor or ceiling tray? In existing buildings, cable routes are often the biggest cost driver.
  6. Agree client-side worksSettle in writing who provides which preparatory works, and by when – more on this in the next section.
  7. Involve IT and data protectionClarify questions on networking, software on the computers and wireless before the tender, not after the award.
  8. Set the dateSchedule installation, commissioning and briefing for a period without teaching, with a buffer for delivery times.

What does the client need to prepare?

Client-side works are carried out by the client or another trade, not by the AV supplier. Unclear boundaries bring sites to a standstill. For a hardware-based teacher-student system, they usually include:

  • Power at the instructor's desk, trainee seats and, if applicable, the equipment rack
  • Cable routes of sufficient cross-section between all seats
  • PCs or source devices at every seat
  • Monitors with an HDMI or DVI input; Full HD at 60 Hz is recommended
  • Furniture with cable grommets and space for a small box per seat
  • Mounts and connections for a projector or large display

Tip: ask the supplier for a connection diagram before the furniture is ordered. That way grommets and cable routes end up in the right place.

How do you tender AV technology for training rooms?

Public contracting authorities generally have to tender on a product-neutral basis. That is not an obstacle but an opportunity to describe precisely what the room has to do.

  • Use market research: before the tender you may consult manufacturers, have systems demonstrated and look at reference sites. It sharpens the requirements.
  • Specify functions: describe performance, not products – for example: picture distribution from the instructor's desk to all, individual or groups of seats; one trainee's picture to all; no software on the computers; no connection to the data network; uncompressed transmission.
  • Involve suppliers early: manufacturers and specialist planners answer questions on cable routes, furniture and construction sequence best while changes still cost nothing.
  • Specialist AV planner: determines requirements, prepares the bill of quantities and oversees execution.
  • Weight the criteria: besides price, ease of use, failure behaviour, warranty and running costs over the service life all count.

Typical mistakes are specifications that trace one manufacturer's product and requirements nobody in the room actually needs. Thorough market research avoids both.

When should installation take place?

AV technology is best installed when the room is not in use: at universities between terms, at schools and academies over the summer. Because these windows are the same for everyone, tradespeople and suppliers are in particularly high demand then.

  • Time planning and tendering so that the contract is awarded a few months before the installation window
  • Finish furniture and cable routes before the AV equipment goes in
  • Reserve time for commissioning, functional testing and briefing before teaching starts
  • Plan a second briefing date in case not all instructors can attend

Have you thought of everything?

  • Floor plan with furniture and seat count is available
  • All sources and their video outputs are listed
  • The operating concept is decided (touchscreen, app, keyboard, media control)
  • Projection or displays and their sight lines are planned
  • Cable routes and furniture grommets are coordinated
  • Client-side works are agreed in writing
  • IT security and data protection have confirmed the requirements
  • The specification is functional and product-neutral
  • Installation window, commissioning and briefing are scheduled
  • Warranty, maintenance and the contact for operation are settled

What does EBS take care of in a project?

At EBS a project follows fixed steps, with one contact from the first question to the handover briefing:

  1. Conversation about the room, teaching and requirements
  2. Room proposal with a cost estimate based on floor plan and seat count
  3. Delivery, installation and system cabling
  4. Configuration of the control interface to match the seating plan
  5. Commissioning with functional testing
  6. Briefing for instructors and facilities staff, documentation
  7. 3-year warranty, optionally 5; maintenance on request

For tenders, EBS provides functional specification texts. There is no flat price, because every system is configured for its room.

How does EBS do it?

EBS has been planning training rooms since 1984 – from single PC rooms to labs with microscopes and dental simulators. The case studies show how such projects have gone; How we work describes the process in detail.

See how we work

Common questions

Questions about planning.

Objections and questions we hear from planners, trainers and IT managers.

Request a consultation
  • As soon as it is clear that a room will be fitted out or refurbished. Cable routes and furniture can then still be adapted at no extra cost. If only the AV equipment in an existing room is being replaced, a shorter lead time is usually enough.

  • In many cases, yes: the system sits between computer and monitor, and the devices stay. With very old monitors it is worth checking the connections.

  • Not necessarily for a single room with clear requirements; manufacturers also advise directly. For several rooms, new builds or many trades involved, a specialist planner is worthwhile because they coordinate the interfaces with electrical, furniture and IT.

  • That depends on the seat count, cable routes and preparatory works, and is clarified in conversation. If cable routes and furniture are finished before the date, the time needed in the room is considerably shorter.

  • Yes: in the live demo in your browser, in an online presentation on a real system or on a visit to Heusenstamm.

  • Many functions can be added later, such as the app, call-for-help buttons, audio or further sources. So plan cable routes with spare capacity.